Choosing finishes for your renovation: what to settle before builders price

Writer: Harper Latter Architects
Harper Latter Architects
2 days ago
3 min read

Brick and glazed rear extension beneath a white house with a red tiled roof

A floor plan can show where the kitchen goes without saying which worktop, cupboard fronts or handles you want. A bathroom layout can make sense while the fittings remain undecided. These choices are part of the design, but they also need a place in the information builders use to price your project.

For a refurbishment or extension in Wimbledon, the aim is not to choose every decorative item at once. It is to distinguish decisions that affect the building from those that can wait, and to make any open choices visible rather than leaving each contractor to guess.

Start with a room-by-room list

Create a simple list with your architect: room, item, preferred option, current status and the date a decision is needed. Include flooring, wall finishes, doors, ironmongery, sanitary fittings, lighting and fitted storage where they form part of the work. Mark each entry as agreed, under review or still to be selected.

Keep this separate from your inspiration board. Images help explain the atmosphere you want, but a photograph of a bathroom does not define the fitting model, finish or installation requirements. Your list is a working record of choices, not a substitute for the drawings and specification.

Ask which choices affect other work

Some finishes reach beyond the surface. Flooring needs to work with adjoining levels and thresholds. A particular shower arrangement may affect the bathroom layout and service routes. Kitchen appliances influence cabinetry, clearances and connections. Fitted wardrobes need enough space for doors to open and people to move comfortably.

Ask your architect which decisions must be coordinated now. That question is more useful than assuming paint, taps and tiles all share one deadline. The project team should explain what each choice affects and what information a specialist supplier needs. Avoid buying an item simply because it is discounted before its suitability has been checked.

Describe the standard you actually want

Words such as "good quality" or "luxury" mean different things to different people. Bring the conversation down to something you can compare: a particular finish, a sample, a product reference or an agreed performance requirement.

For a timber floor, for example, appearance is only one part of the discussion. Ask how the proposed product relates to the room's use, cleaning, installation and any heating system. For joinery, discuss the internal arrangement as well as the door fronts. Your architect and relevant specialists can turn those preferences into coordinated project information rather than a collection of shopping links.

Look at samples together

A small screen image is a useful starting point, not a final test. Where practical, review physical samples of the main finishes together and in the light in which they will be used. A floor, wall colour and cabinet finish need to make sense as a group.

Record the agreed sample and its reference. If a selection changes, tell the team which earlier choice it replaces. For an existing home, also discuss how new work meets retained doors, stairs and other details. A finish that looks convincing in isolation can feel quite different beside the fabric you are keeping.

Make undecided items visible at tender

You may still have open selections when the project is ready for pricing. Ask how each one is described in the tender information and what the contractor is being asked to include. Is a product defined, is an agreed allowance being used, or is part of the work excluded?

Do not compare headline totals until the team has checked those assumptions. A lower price may describe a different scope or finish rather than the same work for less. Ask what a later selection would change and how any cost or programme effect would be reviewed. The answer should be clear before you treat the price as your working budget.

Keep a record as the design develops

Use one dated decision list rather than several versions circulating in emails. Agree who updates it and how you confirm a change. Keep product information and samples linked to the relevant item, and ask the team to check proposed substitutions against the agreed design and requirements.

Our architectural process takes a project from the brief and sketch designs through detailed design, tender information and construction. If you are planning a refurbishment or extension, start by telling us how you want the rooms to work. We can then discuss the decisions needed for your project, their timing and the services included in our appointment.

 
 
 

Comments


Harper Latter logo
Association logos

OFFICE

Common Ground

Hill Place House

55a High St

Wimbledon

London

SW19 5BA

​

Harper Latter Architects Ltd, registered as a limited company in England and Wales under company number: 13669979.  Registered Company Address: 3rd Floor, 24 Old Bond Street, London, W1S 4AP

Terms of Use | Privacy & Cookie Policy | Trading Terms © 2026. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

© Copyright
bottom of page